Thursday, 14 May 2015

Sydney's abandoned rail tunnels

These forgotten tunnels and station platforms, built decades ago to accommodate for a much greater suburban network, never had an active train run through them. And never will.

John Bradfield, the man who designed the suburban network, the City Circle underground and the Harbour Bridge, wanted lines to Bondi, Randwick, Balmain and the Northern Beaches, among others. When the current City Circle and Central to North Sydney lines were being built in the 1920s, Bradfield added small sections of tunnel to allow for the these other lines, if they were ever built.

Two single line tunnels run from St James Station, each a kilometre long, lie beneath Hyde Park for the proposed Bondi and Randwick lines. North of St James, a tunnel was built for the Balmain line. It now sits under Macquarie Street and terminates under the Botanic Gardens.

The tunnels run into two centre platforms at St James, complete with tiles, now hidden from the public gaze.


Sydney Trains director of operations Tony Eid, took the 'Today' show on to Central's platforms 26 and 27, built at the same time as the Eastern Suburbs line, which opened in 1979. The platforms, just concrete shells, sit above the underground platforms 24 and 25 on the Eastern Suburbs and Illawarra lines.

Here is a little sneak peak, behind closed doors!



** Sourced: ABC Radio National, Australia For Everyone

- Tim

Friday, 24 April 2015

Electrification Of Sydney's Trains

John Bradfield devised a plan to electrify Sydney's commuter Railway System. In 1926, the first section electrified was from Central to Oatley on the Illawarra line. the St James Branch line also received the same special treatment when it opened in the same year. Originally, the cables only powered the trains with 1500 volt currents. While this was inferior to and more expensive than modern single phase alternating current equipment, in the 1920s it was sufficient for the operation of electric multi-carriage trains. By the late 1980's, most of the network's equipment had been updated to accommodate for the new "Tangora" type Train, which relied on 2500 volt alternating currents.


Floor Layout of a Tangora Train

~ Cameron

Friday, 10 April 2015

History of Trains In Sydney Bradfield Era

In 1912, the NSW Public Works Department appointed John Bradfield as Chief Engineer for Metropolitan Railway construction. In 1915 he designed a plan to electrify the all Railway Lines and to Build the City Circle Loop as we know today. This didn't take off until after World War 1, once the government had some money to build these large scale capital work projects. The Tunnels were built from central to Museum & St James first, opening in 1926, with the western portal from Central to Wynyard via Town Hall completed by 1932. The Western portal then continued and connected Wynyard with the Sydney Harbour Bridge in the same year. Bradfield's original plans to connect the 2 lines and create a city circle Loop wasnt completed until 1956, as the government had run low on cash during the great depression and the outbreak of Word War 2, meaning Bradfield died before seeing his work completed.

~ Cameron
John Bradfield's Original Railway Plans

Friday, 3 April 2015

History of Trains In Sydney Pre 1900

The first railway in Sydney was opened in 1855 between Sydney and Granville, when NSW had a population of less than 350 000. At the time Granville was a major Agricultural center in Sydney, because of this it was serviced by Commuter and Freight Services. In 1884 the network extended from Strathfield to Hornsby. Progress continued on a swing and by 1894 the network as we see today was starting to take shape. The North Shore line was built from North Sydney to Hornsby and the main Western Line was extended from Granville to Richmond and the Blue Mountains in the west and the Illawarra Line was built down to Waterfall and Nowra
Sydney's Railway Network 1900