![]() |
Floor Layout of a Tangora Train |
Showing posts with label electricity. Show all posts
Showing posts with label electricity. Show all posts
Friday, 24 April 2015
Electrification Of Sydney's Trains
John Bradfield devised a plan to electrify Sydney's commuter Railway System. In 1926, the first section electrified was from Central to Oatley on the Illawarra line. the St James Branch line also received the same special treatment when it opened in the same year. Originally, the cables only powered the trains with 1500 volt currents. While this was inferior to and more expensive than modern single phase alternating current equipment, in the 1920s it was sufficient for the operation of electric multi-carriage trains. By the late 1980's, most of the network's equipment had been updated to accommodate for the new "Tangora" type Train, which relied on 2500 volt alternating currents.
~ Cameron
Friday, 3 April 2015
Proposed railways in Sydney
Bradfield railway scheme, 1920s
The main proponent of electrifying the city and suburban railway was Dr John Bradfield, an important name in the history of Sydney's transport. From before World War I, Bradfield submitted various plans for improving Sydney's railway network. He identified some of Sydney's major transport problems: the need to extend the railway into the city; the need to connect Sydney with North Sydney by either bridging or tunnelling under the harbour, and the 'need' for an eastern suburbs railway. These issues were to be taken up time and again.
The Christie Report, 2002
The Christie Report advised the extension of the southern rail
line to growth areas west of Glenfield, to construct a heavy-rail line
linking Chatswood with Parramatta in the one direction and the Hills
district linking to Richmond in the other. It also advocated the
building of integrated "metro" services linking the CBD with Parramatta,
with two further metro lines linking Castle Hill in the north-west with
Hoxton Park in the south-west, and Cronulla in the south with Dee Why
and the northern beaches.
The North West Rail Link, also known as the NWRL, is an $8.3 billion high priority rapid
transit rail infrastructure project for the NSW Government that is
targeted to open in 2019. The NWRL will initially operate between Cudgegong
Road and Chatswood consisting of eight new stations between Cudgegong
Road and Epping. There will be approximately 15.5kms of tunnels
from Epping to Bella Vista, a 4kms elevated section between
Bella Vista and Rouse Hill and conversion of the existing Epping to
Chatswood Rail Link (ECRL) to suit the rapid transit system.
- Tim
The main proponent of electrifying the city and suburban railway was Dr John Bradfield, an important name in the history of Sydney's transport. From before World War I, Bradfield submitted various plans for improving Sydney's railway network. He identified some of Sydney's major transport problems: the need to extend the railway into the city; the need to connect Sydney with North Sydney by either bridging or tunnelling under the harbour, and the 'need' for an eastern suburbs railway. These issues were to be taken up time and again.
The Christie Report, 2002
North West Rail Link (NWRL), Currently in progress
- Tim
***ALL IMAGES SOURCES FROM <http://en.wikipedia.org/wiki/Proposed_railways_in_Sydney> ***
Subscribe to:
Posts (Atom)
